1T Gas Fired Steam Vertical Boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :1T Gas Fired Steam Vertical Boiler
  • Supply Capacity : 10 units/month :1T Gas Fired Steam Vertical Boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Thermodynamics: An Engineering Approach - 5th Edition

    8–83 A vertical piston–cylinder device initially contains 0.1 m3 of helium at 20°C. The milk is heated to the pasteurizing temperature by hot water heated in a natural gas-fired boiler Get Price

  • Neufert 4th Edition | PDF | Elevator | Roof

    ~ gas room heater for external wall Paper formats change of cross-section Technical)( (stating nominal diameter) connection (stating connection appliance capacity volume flow capacity) (kW) (m 3/h) drawings rn'ln Layout of gas water 8.8-28.1 1.14-3.62 drawings gas pipe house entry heater Construction gas heating boiler circulating 9.5-28.4 1.23 Get Price

  • Thermo problem set no. 2 - SlideShare

    Dec 17, 2017 · Steam enters the turbine of a cogeneration plant at 7 MPa and 500oC. Steam at a flow rate of 7.6 kg/s is extracted from the turbine at 600 kPa pressure for process heating. The remaining steam continues to expand to 10 kPa. The recovered condensates are pumped back to the boiler. The mass flow rate of steam that enters the turbine is 30 kg/s.Get Price

  • Electric Power Questions and Answers | Study.com

    A 1250-W water boiler is filled with 800 grams of water at 15 degrees C. It is connected to a 110-V electric power supply. When the boiler is switched on (at full power), it takes 4 minutes and 10Get Price

  • Thermodynamics: An Engineering Approach - 5th Edition

    8–83 A vertical piston–cylinder device initially contains 0.1 m3 of helium at 20°C. The milk is heated to the pasteurizing temperature by hot water heated in a natural gas-fired boiler Get Price

  • Design Guidelines for an Optimum Scrubber System

    ----- CONTENTS Abstract ii Figures iv Tables v Conversion Table vi 1.0 Introduction 1 1.1 Purpose of the Report 1 1.2 Scope of the Report 1 2.0 Conclusions and Recommendations 2 3.0 The Power Plant as a Source of Pollution 5 3.1 Overall Process Description 5 3.2 Coal Characterization 7 3.3 Characterization of Flue Gas from Coal-Fired Utility Boilers 7 3.4 Legal Aspects: The New …Get Price

  • Neufert 4th Edition | PDF | Elevator | Roof

    ~ gas room heater for external wall Paper formats change of cross-section Technical)( (stating nominal diameter) connection (stating connection appliance capacity volume flow capacity) (kW) (m 3/h) drawings rn'ln Layout of gas water 8.8-28.1 1.14-3.62 drawings gas pipe house entry heater Construction gas heating boiler circulating 9.5-28.4 1.23 Get Price

  • Electric Power Questions and Answers | Study.com

    A 1250-W water boiler is filled with 800 grams of water at 15 degrees C. It is connected to a 110-V electric power supply. When the boiler is switched on (at full power), it takes 4 minutes and 10Get Price

  • Thermo problem set no. 2 - SlideShare

    Dec 17, 2017 · Steam enters the turbine of a cogeneration plant at 7 MPa and 500oC. Steam at a flow rate of 7.6 kg/s is extracted from the turbine at 600 kPa pressure for process heating. The remaining steam continues to expand to 10 kPa. The recovered condensates are pumped back to the boiler. The mass flow rate of steam that enters the turbine is 30 kg/s.Get Price

  • Combustion engineering summer 2019 - SlideShare

    May 21, 2019 · Example No. 5 (Coal Fuel) The following data were obtained from a boiler test: Ultimate analysis of coal as fired is; C = 62%, H2 = 4%, O2 = 8%, N2 = 1 %, S = 2%, H2O = 8% and Ash = 15%. Excess air is 25% for complete combustion. Fuel and air temperature and pressure are, 25 C and 101 KPa, respectively.Get Price

  • Boiler Circulation Problems Troubleshooting #1 Step-by-Step

    Boiler Circulation Problems | Troubleshooting Hydronic Water Loops – Richard, we have a hot water boiler and we are having problems with the circulation of the water. The radiators are cool and we don't seem to have good heat. The boiler seems …Get Price

  • Combustion engineering summer 2019 - SlideShare

    May 21, 2019 · Example No. 5 (Coal Fuel) The following data were obtained from a boiler test: Ultimate analysis of coal as fired is; C = 62%, H2 = 4%, O2 = 8%, N2 = 1 %, S = 2%, H2O = 8% and Ash = 15%. Excess air is 25% for complete combustion. Fuel and air temperature and pressure are, 25 C and 101 KPa, respectively.Get Price

  • Design Guidelines for an Optimum Scrubber System

    ----- CONTENTS Abstract ii Figures iv Tables v Conversion Table vi 1.0 Introduction 1 1.1 Purpose of the Report 1 1.2 Scope of the Report 1 2.0 Conclusions and Recommendations 2 3.0 The Power Plant as a Source of Pollution 5 3.1 Overall Process Description 5 3.2 Coal Characterization 7 3.3 Characterization of Flue Gas from Coal-Fired Utility Boilers 7 3.4 Legal Aspects: The New …Get Price

Discount
7X24 Online