High Pressure Boiler Water Parameters Above 150 Kg Cm2

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :High Pressure Boiler Water Parameters Above 150 Kg Cm2
  • Supply Capacity : 10 units/month :High Pressure Boiler Water Parameters Above 150 Kg Cm2
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • DSR 2021 Vol I English Dir | PDF | Construction Aggregate

    0001 Hire charges of Coaltar Boiler 900 to 1400 litres day 800.00 0002 Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper day 800.00 0003 Hire charges of Diesel Road Roller litre 120.00 0850 White lead kg 170.00 0851 Water proofing cement paint kg 38.00 0855 Wax polish 2611 EPDM Gasket in Kg (Above 60 g / m) kg 156.00 Get Price

  • NCERT Physics Question Paper (Class - 11) | CBSE EXAM

    [Heat of fusion of water = 335 × 103 J kg–1] Question 11.20 A brass boiler has a base area of 0.15 m2 and thickness 1.0 cm. It boils water at the rate of 6.0 kg/min when placed on a gas stove. Estimate the temperature of the part of the flame in contact with the boiler. Thermal conductivity of brass = 109 J s–1 m–1 K–1 ; Heat of Get Price

  • Super critical boiler - SlideShare

    Aug 21, 2014 · Impact of critical point on the Boiling Process Beyond critical point of water, the latent heat of vaporization becomes zero and there is no distinction between liquid and vapor phase of water. Absolute Pressure (Bar) Saturation Temperature (o C) Latent Heat (K J/Kg.) 50 150 200 221 264 342 366 374 1640 1004 592 0 6.Get Price

  • PIPING MATERIAL SPECIFICATION (PMS)

    Section VIII of ASME Boiler and Pressure Vessel Code and equipped with safety locking devices in compliance with Section VIII, division 1. UG-35.2 of ASME Boiler and Pressure Vessel Code. 14.0 HYDROTESTING VENTS AND DRAINS In terminal piping, high point vents and low point drains required for the purpose of hydrotesting shall be of size 0.75".Get Price

  • NCERT Physics Question Paper (Class - 11) | CBSE EXAM

    [Heat of fusion of water = 335 × 103 J kg–1] Question 11.20 A brass boiler has a base area of 0.15 m2 and thickness 1.0 cm. It boils water at the rate of 6.0 kg/min when placed on a gas stove. Estimate the temperature of the part of the flame in contact with the boiler. Thermal conductivity of brass = 109 J s–1 m–1 K–1 ; Heat of Get Price

  • NCERT Physics Question Paper (Class - 11) | CBSE EXAM

    [Heat of fusion of water = 335 × 103 J kg–1] Question 11.20 A brass boiler has a base area of 0.15 m2 and thickness 1.0 cm. It boils water at the rate of 6.0 kg/min when placed on a gas stove. Estimate the temperature of the part of the flame in contact with the boiler. Thermal conductivity of brass = 109 J s–1 m–1 K–1 ; Heat of Get Price

  • PIPING MATERIAL SPECIFICATION (PMS)

    Section VIII of ASME Boiler and Pressure Vessel Code and equipped with safety locking devices in compliance with Section VIII, division 1. UG-35.2 of ASME Boiler and Pressure Vessel Code. 14.0 HYDROTESTING VENTS AND DRAINS In terminal piping, high point vents and low point drains required for the purpose of hydrotesting shall be of size 0.75".Get Price

  • Super critical boiler - SlideShare

    Aug 21, 2014 · Impact of critical point on the Boiling Process Beyond critical point of water, the latent heat of vaporization becomes zero and there is no distinction between liquid and vapor phase of water. Absolute Pressure (Bar) Saturation Temperature (o C) Latent Heat (K J/Kg.) 50 150 200 221 264 342 366 374 1640 1004 592 0 6.Get Price

  • Great Western steam locomotives - 'Castle' class index

    Jul 17, 2013 · The 'Castle's' tractive effort was 31,625 pounds at 85 per cent boiler pressure compared to the 'Star's' 27,800 pounds, and the 29,835 pounds, also at 85 per cent boiler pressure, of the first Gresley Pacifics of the LNER. The grate area was increased to 29.4 square feet in the 'Castle' from the 27.07 square feet in the 'Star'.Get Price

  • Super critical boiler - SlideShare

    Aug 21, 2014 · Impact of critical point on the Boiling Process Beyond critical point of water, the latent heat of vaporization becomes zero and there is no distinction between liquid and vapor phase of water. Absolute Pressure (Bar) Saturation Temperature (o C) Latent Heat (K J/Kg.) 50 150 200 221 264 342 366 374 1640 1004 592 0 6.Get Price

  • PIPING MATERIAL SPECIFICATION (PMS)

    Section VIII of ASME Boiler and Pressure Vessel Code and equipped with safety locking devices in compliance with Section VIII, division 1. UG-35.2 of ASME Boiler and Pressure Vessel Code. 14.0 HYDROTESTING VENTS AND DRAINS In terminal piping, high point vents and low point drains required for the purpose of hydrotesting shall be of size 0.75".Get Price

Discount
7X24 Online