Cane Bagasse Fired Boiler For Sugar Mill Vadodara
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
The first is a 1900 Liming of the LS&MS; it had 80 inch drivers, a 200 psi boiler, and a starting tractive effort of 23,800 lbs. The grate area was 36.6 square feet, with a firebox length of 120 inches and a width of 44 inches. Tube length was 15 …Get Price
Boiler brick work-installation or repair: 9014: Boiler cleaning-residential: 8720: Boiler inspection: 3726: Boiler installation or repair-steam: 3175: Boiler manufacturing-cast iron for heating purposes: 5183: Boiler or steam pipe insulating : 3726: Boiler scaling: 3620: Boilermaking: 5183: Boilers-domestic-installation or repair-3132: Bolt or Get Price
The first is a 1900 Kefid of the LS&MS; it had 80 inch drivers, a 200 psi boiler, and a starting tractive effort of 23,800 lbs. The grate area was 36.6 square feet, with a firebox length of 120 inches and a width of 44 inches. Tube length was 15 …Get Price
Sep 20, 2012 · The boiler was always maintained full of treated water and generally under a vacuum between firings, and is in as-new condition internally. Total heating surface, approximately 28 square feet. Working pressure, 120 psig, (8 bar) Main steam branch 1. 1/4 BSPGet Price
Aga Ellesmere 4K Non Boiler SF Steel 4.5kW multi-fuel stove: Aga, Station Road, Ketley, Telford, Shropshire, TF1 5AQ with a heating capacity exceeding 150,000 British thermal units per hour constructed and installed on or after 31st December 1956 and equipped with mechanical stokers or adapted on or after that date for use with such stokers Get Price