horizontal wet back coke oven gas steam boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :horizontal wet back coke oven gas steam boiler
  • Supply Capacity : 10 units/month :horizontal wet back coke oven gas steam boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Waste heat recovery technologies and applications

    Jun 01, 2018 · For instance, the waste heat from a coke oven can be recovered through coke dry quenching and wet quenching. The process of coke dry quenching involves catching the hot incandescent coke in a cooling chamber and by passing an inert gas over the coke to recover and deliver the waste heat loss to a waste heat boiler [169] .Get Price

  • Fundamentals of Mechanical Engineering - EIT | Engineering

    Creep failure is an important phenomenon for steam and chemical plants which operate at high temperatures of 450 to 550°C, boilers, ovens, gas turbines, supersonic jets, rockets, missiles, and nuclear plants all working at very high temperatures. Creep failures or ruptures are easy to identify due to the deformation (necking) that occurs.Get Price

  • Waste heat recovery technologies and applications

    Jun 01, 2018 · For instance, the waste heat from a coke oven can be recovered through coke dry quenching and wet quenching. The process of coke dry quenching involves catching the hot incandescent coke in a cooling chamber and by passing an inert gas over the coke to recover and deliver the waste heat loss to a waste heat boiler [169] .Get Price

  • Thermodynamics: An Engineering Approach [8 ed

    Superheating the Steam to High Temperatures (Increases Thigh,avg) Increasing the Boiler Pressure (Increases Thigh,avg) 10–5 The Ideal Reheat Rankine Cycle 10–6 The Ideal Regenerative Rankine Cycle Open Feedwater Heaters Closed Feedwater Heaters 10–7 Second-Law Analysis of Vapor Power Cycles 10–8 Cogeneration 10–9 Combined Gas–Vapor Get Price

Discount
7X24 Online